Construction Specifications
Umpqua Basin Water Association Inc. 
"Drinking Water You Can Trust"
UBWA Construction Specs

Umpqua Basin Water uses certain construction specifications for all installations of our mainline and service lines. 

Our engineer of record is i.e. Engineering. You can reach them at 541-673-0166 or visit their website at http://www.ieengineering.com.

You can download a copy of our specs right here of our website by clicking on the link below. 

UBWA Mainline Standards and Specifications for Construction 
Umpqua Basin Water Assn.
The North Umpqua River
This page was last updated: March 18, 2019
External Links
Home Page
Membership
Rates and Fees
The Meter
UBWA Board of Directors
Contact Us
By-Laws, Rules and Regulations
Back Flow
Water Quality
History
Construction Specs
External Links
Water Source
Click on the red button below for a list of any planned or unplanned water outages